Project: Drilling and casting of 114 piles with 600 mm diameter for construction of a retaining wall on the site of Yazaki plant in the town of Yambol
Employer: Geosonda Service Engineering OOD
Project execution period: 2008
Project: Biomass Heating Plant – drilling and casting of 230 piles with 400 mm diameter, the town of Ihtiman
Project of Energoproject AD
Project execution period: 2008
Project: Building site for installation of 23 bored cast-in-situ piles with 600 mm diameter, “Column” plant
Employer: Solvay Sodi AD, the town of Devnya
Project execution period: 2005-2007
1-st class facility, which includes a 56-meter high distillery tower, weighing 1500 tons.